Virtual Early Works Meet & Engage: EWR-154.940I: Y4 Tail Track Modifications Order (Range B)

 

As part of the Port Authority’s multi-phase procurement process for the AirTrain Newark Replacement Program, this event for local MWBEs will introduce you to the participating primes, scopes of work, and identify next steps.

 

We invite local MWBEs in the following categories of work:

 

General Conditions: Site Survey; Vibration Monitoring
Civil: Concrete Demolition; Fence Removal
Structural: Concrete; Steel; Demolition
Mechanical: HVAC Removal/ Relocation
Plumbing: Storm pipe; gas pipe
Electrical: Removals; New Wiring; Disconnect Switches; Conduit and Wiring
Fire Protection: Temp FSP; New Dry FSP
Environmental: Soil disposal; Silt Fence; Inlet Protection
Geotechnical: Micropiles

Thursday, May 9, 2024
2:00 PM - 3:00 PM EST
More Info
Event Flyer
Share