As part of the Port Authority’s multi-phase procurement process for the AirTrain Newark Replacement Program, this event for local MWBEs will introduce you to the participating primes, scopes of work, and identify next steps.
We invite local MWBEs in the following categories of work:
General Conditions: Site Survey; Pavement Markings; Drainage; Asphalt; Concrete
Maintenance of Traffic: Signs; Barrels; Equipment; MOT set-up
Electrical: Light poles
Landscape Architecture: Tree Protection; Seeding
Environmental: Soil disposal; Soil and Sediment Control